THIRD AVE over OLENTANGY RIVER (THIRD)

.15 MI E. OF OLENT.RV.RD · County 049, Ohio · Built 1997 · 4 Lanes · 1,939 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2535742
Year Built
1997
Length
84.1 m (275.9 ft)
Max Span
41.1 m
Width
11 m (36.1 ft)
Lanes
4
Daily Traffic
1,939
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.