SR 315 over OLENTANGY R|5TH|KING

2.78 MI N OF I 70 · County 049, Ohio · Built 1969 · 6 Lanes · 69,963 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
2515393
Year Built
1969
Length
597.1 m (1959 ft)
Max Span
32.9 m
Width
31.7 m (104 ft)
Lanes
6
Daily Traffic
69,963
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.