USR 33 over OLENTANGY RIVER

0.16 MI E OF SR315 · County 049, Ohio · Built 1954 · 3 Lanes · 11,117 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
2501473
Year Built
1954
Reconstructed
1999
Length
121.9 m (399.9 ft)
Max Span
23.2 m
Width
13.7 m (44.9 ft)
Lanes
3
Daily Traffic
11,117
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.