SR 315 over OVER US-33

1.34 MI. N. OF I-70 · County 049, Ohio · Built 2001 · 5 Lanes · 75,284 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2501414
Year Built
2001
Length
71.2 m (233.6 ft)
Max Span
22.7 m
Width
35.8 m (117.5 ft)
Lanes
5
Daily Traffic
75,284
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.