I-71 NB over ALUM CREEK

2.87 MI N OF FRANKLIN CO · County 041, Ohio · Built 1959 · 2 Lanes · 41,597 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
2102102
Year Built
1959
Reconstructed
2001
Length
89.3 m (293 ft)
Max Span
24.4 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
41,597
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.