IR-71 SB over BALE KENYON RD (TR107)

2.46 N. OF 270 · County 041, Ohio · Built 2001 · 3 Lanes · 41,597 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2102021
Year Built
2001
Length
29.6 m (97.1 ft)
Max Span
18.3 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
41,597
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.