IR 90 WB over CUY RIVER VALLEY

.65 MI. E. OF JCT IR-71 · County 035, Ohio · Built 2013 · 6 Lanes · 64,518 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1809431
Year Built
2013
Length
1324.8 m (4346.5 ft)
Max Span
115.8 m
Width
42.7 m (140.1 ft)
Lanes
6
Daily Traffic
64,518
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.