IR 90 EB over CUY RIVER VALLEY

.67 MI. E. OF JCT IR-71 · County 035, Ohio · Built 2016 · 5 Lanes · 71,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1808788
Year Built
2016
Length
1193.8 m (3916.7 ft)
Max Span
110.1 m
Width
31.4 m (103 ft)
Lanes
5
Daily Traffic
71,000
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.