IR 77 SB. over CR 39 (PLEASANT VALLEY)

3.14 MI. N. OF JCT. SR-82 · County 035, Ohio · Built 1969 · 4 Lanes · 38,666 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1806122
Year Built
1969
Reconstructed
2010
Length
47.9 m (157.2 ft)
Max Span
24.7 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
38,666
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$410,000
Total Project Cost
$456,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.