IR 77 SB. over CR 157 (BROOKSIDE RD)

2.88 MI. N. OF JCT. SR82 · County 035, Ohio · Built 1969 · 3 Lanes · 42,630 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
1806068
Year Built
1969
Reconstructed
2010
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
27.7 m (90.9 ft)
Lanes
3
Daily Traffic
42,630
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$425,000
Total Project Cost
$472,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.