US 30 WB over RIVER RD & OHIO RIVER

AT APPROACH OHIO R.BR. · County 029, Ohio · Built 1976 · 2 Lanes · 6,040 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
1502396
Year Built
1976
Length
237.1 m (777.9 ft)
Max Span
68.8 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
6,040
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$835,828,000
Total Project Cost
$835,828,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.