US 30 EB over RR;RIVER RD;OHIO R.

1.61 MI E OF SR 7 · County 029, Ohio · Built 1976 · 2 Lanes · 9,836 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
1502388
Year Built
1976
Length
238.8 m (783.5 ft)
Max Span
69.4 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
9,836
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$107,812,000
Total Project Cost
$107,812,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.