SR 129 over CINCINNATI-DAYTON ROAD

1.0 KM W. OF I-75 · County 017, Ohio · Built 1999 · 3 Lanes · 23,294 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0903639
Year Built
1999
Length
91.3 m (299.5 ft)
Max Span
39.3 m
Width
21.4 m (70.2 ft)
Lanes
3
Daily Traffic
23,294
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.