SR 129 over I.R. 75

AT JUNCTION OF I-75. · County 017, Ohio · Built 1998 · 3 Lanes · 6,039 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0901814
Year Built
1998
Length
91.8 m (301.2 ft)
Max Span
32.6 m
Width
35.5 m (116.5 ft)
Lanes
3
Daily Traffic
6,039
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.