IR 70 over STILLWATER CR USR 40

2.01 MI E OF SR 800 · County 013, Ohio · Built 2016 · 2 Lanes · 32,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0710001
Year Built
2016
Length
92.3 m (302.8 ft)
Max Span
33.5 m
Width
20.2 m (66.3 ft)
Lanes
2
Daily Traffic
32,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.