SR 800 over MUSKRAT RUN

1.15 Mi S OF US 40 · County 013, Ohio · Built 1951 · 2 Lanes · 6,600 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0705676
Year Built
1951
Reconstructed
2023
Length
25.2 m (82.7 ft)
Max Span
9.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
6,600
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.