LIMA - HIGH ST over OTTAWA RIVER - HIGH ST

.34 MI. EAST OF PINE ST. · County 003, Ohio · Built 2001 · 2 Lanes · 1,866 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
0236640
Year Built
2001
Length
46.2 m (151.6 ft)
Max Span
14.6 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,866
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.