CR190 RESERVOIR RD over IR 75

1MILE NORTH 0F SR. 309 · County 003, Ohio · Built 2012 · 3 Lanes · 7,995 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0202177
Year Built
2012
Length
54.3 m (178.1 ft)
Max Span
26.8 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
7,995
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.