ND HIGHWAY 13 over CLEAR CREEK

3 EAST OF US 83 · County 029, North Dakota · Built 1961 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0013203066
Year Built
1961
Length
25.9 m (85 ft)
Max Span
12.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
600
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$89,000
Total Project Cost
$134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.