Schley Ave over SPRING CREEK

IN LINTON · County 029, North Dakota · Built 1940 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000015118260
Year Built
1940
Reconstructed
2004
Length
7.6 m (24.9 ft)
Max Span
6.7 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$121,000
Total Project Cost
$182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.