US HIGHWAY 2 over FRESHWATER COULEE
7 WEST OF GRAND FORKS · County 035, North Dakota · Built 1963 · 2 Lanes · 5,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.933078, -97.234025
This bridge is in worse condition than 42.1% of bridges in County 035. The average bridge in North Dakota is 0 years old; this one is 63 years old.
Nearby Bridges
US HIGHWAY 2 over FRESHWATER COULEE
Built 1985
COUNTY HIGHWAY over SALT WATER COULEE
Built 1958
US HIGHWAY 2 over SALTWATER COULEE
Built 1963
US HIGHWAY 2 over SALTWATER COULEE
Built 2021
COUNTY HIGHWAY over COULEE
Built 1950
COUNTY HIGHWAY over SALT WATER COULEE
Built 2002
COUNTY HIGHWAY over FRESH WATER COULEE
Built 1947
17TH ST NE over CREEK
Built 2024
COUNTY HIGHWAY over COULEE
Built 1980
COUNTY HIGHWAY over ENGLISH COULEE DRAIN #11
Built 2011
Bridge Details
- Structure #
- 0002348946 R
- Year Built
- 1963
- Reconstructed
- 2006
- Length
- 23.8 m (78.1 ft)
- Max Span
- 11.6 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 5,400
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.