COUNTY HIGHWAY over FRESH WATER COULEE
7 WEST 2 NORTH GRAND FORK · County 035, North Dakota · Built 1947 · 2 Lanes · 35 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.952831, -97.217356
This bridge is in worse condition than 70% of bridges in County 035. The average bridge in North Dakota is 0 years old; this one is 79 years old.
Nearby Bridges
COUNTY HIGHWAY over COULEE
Built 1980
COUNTY HIGHWAY over SALT WATER COULEE
Built 1958
US HIGHWAY 2 over FRESHWATER COULEE
Built 1963
US HIGHWAY 2 over FRESHWATER COULEE
Built 1985
COUNTY HIGHWAY over COULEE
Built 1963
US HIGHWAY 2 over SALTWATER COULEE
Built 1963
US HIGHWAY 2 over SALTWATER COULEE
Built 2021
COUNTY HIGHWAY over SALT WATER COULEE
Built 2002
FIELD DRIVE over ENGLISH COULEE DRAIN
Built 1919
COUNTY HIGHWAY over ENGLISH COULEE DRAIN #11
Built 1983
Bridge Details
- Structure #
- 000000018132170
- Year Built
- 1947
- Length
- 15.2 m (49.9 ft)
- Max Span
- 7 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 35
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $85,000
- Total Project Cost
- $128,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.