COUNTY HIGHWAY over CREEK

5 EAST 2 SOUTH EMERADO · County 035, North Dakota · Built 1919 · 2 Lanes · 35 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000018130210
Year Built
1919
Reconstructed
1960
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
35
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$118,000
Total Project Cost
$177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.