COUNTY HIGHWAY over MAPLE RIVER
5 EAST 2 NORTH MAPLETON · County 017, North Dakota · Built 1943 · 2 Lanes · 20 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.927672, -96.946311
This bridge is in worse condition than 79.4% of bridges in County 017. The average bridge in North Dakota is 0 years old; this one is 83 years old.
Nearby Bridges
COUNTY HIGHWAY over COUNTY DRAIN 14
Built 2021
COUNTY HIGHWAY over SHEYENNE RIVER
Built 1957
COUNTY HIGHWAY over COUNTY DRAIN 14
Built 1952
COUNTY HIGHWAY over RAYMOND COULEE
Built 1989
COUNTY HIGHWAY over SHEYENNE RIVER
Built 1980
COUNTY ROAD 22 over LOWER BRANCH RUSH RIVER
Built 2023
COUNTY ROAD 10 over DRAIN 14
Built 1947
12TH AVE NW-WF over SHEYENNE DIVERSION
Built 1991
COUNTY HIGHWAY over SHEYENNE RIVER
Built 1987
COUNTY HIGHWAY over CREEK
Built 1963
Bridge Details
- Structure #
- 000000009136220
- Year Built
- 1943
- Reconstructed
- 2010
- Length
- 32.9 m (107.9 ft)
- Max Span
- 11.6 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $175,000
- Total Project Cost
- $263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.