COUNTY ROAD 10 over DRAIN 14
4 EAST OF MAPLETON · County 017, North Dakota · Built 1947 · 2 Lanes · 1,555 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.891558, -96.972253
This bridge is in worse condition than 79.4% of bridges in County 017. The average bridge in North Dakota is 0 years old; this one is 79 years old.
Nearby Bridges
ND HWY 10 over I-94/RAYMOND INTERCHANGE
Built 2003
COUNTY HIGHWAY over COUNTY DRAIN 14
Built 1952
INTERSTATE 94 over SHEYENNE RIVER DIVERSION
Built 1990
INTERSTATE 94 over SHEYENNE RIVER DIVERSION
Built 1990
INTERSTATE 94 over LEGAL DRAIN 14
Built 1959
INTERSTATE 94 over LEGAL DRAIN 14
Built 1959
ND HIGHWAY 10 over LEGAL DRAIN 14
Built 1970
US HIGHWAY 10 over I-94/W.FARGO INT.
Built 1960
COUNTY HIGHWAY over I-94/KINDRED INTERCHANGE
Built 2002
COUNTY HIGHWAY over COUNTY DRAIN 14
Built 2021
Bridge Details
- Structure #
- 000000009135240
- Year Built
- 1947
- Reconstructed
- 1954
- Length
- 13.4 m (44 ft)
- Max Span
- 12.8 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,555
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $33,000
- Total Project Cost
- $50,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.