SR1369 over TELLICO CREEK

0.3 MI.W.JCT.SR1366 · County 113, North Carolina · Built 2024 · 2 Lanes · 160 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

35.275817, -83.537247

This bridge is in worse condition than 23.2% of bridges in County 113. The average bridge in North Carolina is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000000001130181
Year Built
2024
Length
17.6 m (57.7 ft)
Max Span
16.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.