I-40 E RAMP- I-77S over WETLANDS

0.2 MI. E. JCT. I-40 EBL · County 097, North Carolina · Built 2022 · 3 Lanes · 15,751 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000970603
Year Built
2022
Length
167.6 m (549.9 ft)
Max Span
34.4 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
15,751
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.