RAMP TO I-77 SOUTH over I-77
1.6MI W/O OLD MOCKSVILLE · County 097, North Carolina · Built 2023 · 2 Lanes · 14,140 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
35.81145, -80.859219
This bridge is in worse condition than 23.7% of bridges in County 097. The average bridge in North Carolina is 0 years old; this one is 3 years old.
Nearby Bridges
I-40 W over I-40W RAMP
Built 2015
I-77 over I-40 W. ACCESS RAMP
Built 2014
I40E over I40W RAMP
Built 2016
I-77 NBL over I40
Built 2022
I77 SBL over I40
Built 2023
I40 E RAMP over FOURTH CREEK
Built 2014
I-40 over UT TO FOURTH CREEK
Built 2022
I-40 (RAMP) over FOURTH CREEK
Built 2021
I-40 RAMPTO I-77SB over I-40
Built 2023
I-40 E RAMP- I-77S over WETLANDS
Built 2022
Bridge Details
- Structure #
- 000000000970601
- Year Built
- 2023
- Length
- 145.6 m (477.7 ft)
- Max Span
- 39.3 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 14,140
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.