RTE 278 over BAYWAY INDUSTRIAL TRACK

I278 NJ/NY BORDER · County 085, New York · Built 2018 · 3 Lanes · 68,239 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000552305D
Year Built
2018
Length
576.7 m (1892.1 ft)
Max Span
53.9 m
Width
20.6 m (67.6 ft)
Lanes
3
Daily Traffic
68,239
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$54,360,000
Total Project Cost
$86,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.