RTE 278 over BAYWAY INDUSTRIAL TRACK

I278 NJ/NY BORDER · County 085, New York · Built 2017 · 4 Lanes · 68,239 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

40.636931, -74.200392

This bridge is in worse condition than 4.3% of bridges in County 085. The average bridge in New York is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
00000000552305C
Year Built
2017
Length
459.3 m (1506.9 ft)
Max Span
53.9 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
68,239
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$39,342,000
Total Project Cost
$62,380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.