190IX NB OFF-RAMP over EXCHANGE ST CSXT RR / A

EXIT N6 OF I190 · County 029, New York · Built 1960 · 2 Lanes · 11,513 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000552015C
Year Built
1960
Reconstructed
1995
Length
174.3 m (571.9 ft)
Max Span
23.5 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
11,513
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$7,835,000
Total Project Cost
$12,424,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.