190IX over NY 957A NY 957A

INT EXIT 21 ON 190I · County 063, New York · Built 1961 · 2 Lanes · 6,436 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
00000000504575A
Year Built
1961
Reconstructed
1989
Length
40.8 m (133.9 ft)
Max Span
39.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
6,436
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$1,888,000
Total Project Cost
$2,994,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.