RTE I190 over NY 957A NIAGARA RIVER

INT EXIT 21 ON 190I · County 029, New York · Built 1963 · 2 Lanes · 28,012 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000005045751
Year Built
1963
Reconstructed
2013
Length
1229.3 m (4033.1 ft)
Max Span
152.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
28,012
Material
Steel Continuous
Design
Truss - Deck
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$70,758,000
Total Project Cost
$112,194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.