PALISADES ROAD over TRIB TO BRANT LAKE

1.1m from Route 8 · County 113, New York · Built 2024 · 2 Lanes

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000003372100
Year Built
2024
Length
7.6 m (24.9 ft)
Max Span
6.3 m
Width
10 m (32.8 ft)
Lanes
2
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.