RTE 8 over Mill Pond Outlet

1.6mi E of I87 Exit 25 · County 113, New York · Built 1900 · 2 Lanes · 2,148 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000001080150
Year Built
1900
Reconstructed
1930
Length
7.3 m (24 ft)
Max Span
7 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
2,148
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$262,000
Total Project Cost
$415,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.