BRP NB ACCESS RAMP over BRONX RIVER

AT TUCKAHOE · County 119, New York · Built 1932 · 2 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000003348650
Year Built
1932
Reconstructed
2020
Length
13.7 m (44.9 ft)
Max Span
12.8 m
Width
14 m (45.9 ft)
Lanes
2
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$984,000
Total Project Cost
$1,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.