MAIN STREET over MNRR HA LINE

0.3 MI E of BRP Exit 3 · County 119, New York · Built 1910 · 4 Lanes · 6,421 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000002225200
Year Built
1910
Reconstructed
2001
Length
20.1 m (65.9 ft)
Max Span
18.2 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
6,421
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$3,649,000
Total Project Cost
$5,786,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.