QUARRY ROAD over MC KNIGHT DITCH

3.4 MI SW OF GOSHEN · County 071, New York · Built 2017 · 2 Lanes · 914 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003344620
Year Built
2017
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
914
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$411,000
Total Project Cost
$652,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.