RTE 17 over ORANGE CO TRAILWAY
0.6 MI W JCT RTS 17 + 207 · County 071, New York · Built 1951 · 3 Lanes · 28,543 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
41.401225, -74.340375
This bridge is in worse condition than 19.9% of bridges in County 071. The average bridge in New York is 0 years old; this one is 75 years old.
Nearby Bridges
RTE 17 over EX - ERIE RR ROW
Built 1949
RTE 17 over ORANGE CO TRAILWAY
Built 1951
RTE 17 over RTE 17M
Built 1949
FLETCHER STREET over 17 17 83101117 RTE 17
Built 2004
RTE 207 over 6 6 83011127 RTE 6
Built 1995
CANAL STREET over RIO GRANDE
Built 1978
RTE 17 over 17 17 83101132 RTE 17
Built 2006
PHILLIPSBURG ROAD over 17 17 83101102 RTE 17
Built 1968
ECHO LAKE ROAD over CHEECHUNK CREEK
Built 1995
CHEECHUNK ROAD over WALLKILL RIVER
Built 1965
Bridge Details
- Structure #
- 000000001014001
- Year Built
- 1951
- Reconstructed
- 2008
- Length
- 31.7 m (104 ft)
- Max Span
- 29.3 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 3
- Daily Traffic
- 28,543
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,934,000
- Total Project Cost
- $9,409,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.