CR 6 over NEW POND BROOK

.5 MI E OF EXIT 30 - I87 · County 031, New York · Built 2021 · 2 Lanes · 238 vehicles/day

Overall
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000003302640
Year Built
2021
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
238
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$480,000
Total Project Cost
$762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.