RTE 9 over SCHROON RIVER

RT 9 2.7 MI S EXIT 30 · County 031, New York · Built 1928 · 2 Lanes · 235 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000001005830
Year Built
1928
Reconstructed
1990
Length
13.4 m (44 ft)
Max Span
12.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
235
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$616,000
Total Project Cost
$976,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.