GARAGE RAMP TO 79 over SB HHP RAMP TO 79 79ST

79 ST BOAT BASIN · County 061, New York · Built 1935 · 1 Lanes · 300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000226771C
Year Built
1935
Length
130.1 m (426.8 ft)
Max Span
8.5 m
Width
7 m (23 ft)
Lanes
1
Daily Traffic
300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,643,000
Total Project Cost
$7,361,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.