RTE 9 over AMTRAK RR W CONN RELIEF

RIVERSIDE DR BET 69&72 ST · County 061, New York · Built 2000 · 2 Lanes · 95,281 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
000000002269200
Year Built
2000
Length
263 m (862.9 ft)
Max Span
27.1 m
Width
24.4 m (80.1 ft)
Lanes
2
Daily Traffic
95,281
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$38,043,000
Total Project Cost
$60,321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.