RTE 9 over AMTRAK RR W CONN RELIEF
RIVERSIDE DR BET 69&72 ST · County 061, New York · Built 2000 · 2 Lanes · 95,281 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
40.779997, -73.988325
This bridge is in worse condition than 1.2% of bridges in County 061. The average bridge in New York is 0 years old; this one is 26 years old.
Nearby Bridges
WEST 70TH STREET over AMTRAK RELIEF
Built 2000
72ND ST over RELIEF
Built 2011
RTE 907V over PEDESTRIAN PATH 79TH ST
Built 1937
WEST 68TH STREET over AMTRAK RELIEF
Built 2000
W 66TH STREET over AMTRAK RR
Built 2007
W 64TH STREET over AMTRAK RR
Built 2007
W 63RD STREET over AMTRAK RR
Built 2008
FREEDOM PLACE SOUT over AMTRAK RR
Built 2008
RTE 907V over 79ST BT BASIN GRG 79ST
Built 1935
RTE 9 over RTE 907V AMTRAK
Built 1937
Bridge Details
- Structure #
- 000000002269200
- Year Built
- 2000
- Length
- 263 m (862.9 ft)
- Max Span
- 27.1 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 2
- Daily Traffic
- 95,281
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $38,043,000
- Total Project Cost
- $60,321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.