HIGH STREET over RR STA ACCESS RD METRO

1.5 MI W SMRP Exit 17 · County 119, New York · Built 1909 · 2 Lanes · 2,064 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
000000002265160
Year Built
1909
Reconstructed
1991
Length
34.7 m (113.8 ft)
Max Span
17.6 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
2,064
Material
Steel
Design
Truss - Thru
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$5,270,000
Total Project Cost
$8,356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.