W MAIN ST over METRO NO COMMUTER HASTI

0.4 MI W JCT US 9&MAIN ST · County 119, New York · Built 1910 · 2 Lanes · 1,612 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002262240
Year Built
1910
Reconstructed
1983
Length
26.8 m (87.9 ft)
Max Span
26.2 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
1,612
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,449,000
Total Project Cost
$3,884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.