DIXON ROAD over W BR CROTON RIVER

3.2 MI SW OF LAKE CARMEL · County 079, New York · Built 1929 · 2 Lanes · 1,330 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002223810
Year Built
1929
Reconstructed
2007
Length
16.8 m (55.1 ft)
Max Span
15.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,330
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$1,238,000
Total Project Cost
$1,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.