FAIR ST over MID BR CROTON RVR

1.4 MI E OF CARMEL · County 079, New York · Built 2006 · 2 Lanes · 8,588 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000003345590
Year Built
2006
Length
11.6 m (38.1 ft)
Max Span
11 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
8,588
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,133,000
Total Project Cost
$1,797,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.