WESTCHESTER AVE over RTE I895 RTE I895 NYC
JCT I95 & I278 · County 005, New York · Built 1964 · 4 Lanes · 18,113 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.827803, -73.885861
This bridge is in worse condition than 55.9% of bridges in County 005. The average bridge in New York is 0 years old; this one is 62 years old.
Nearby Bridges
RTE I895 over SLOPE ADJ TO RR
Built 1964
WESTCHESTER AVE over AMTRAK/CSXT/P&W NYCTA P
Built 1907
WESTCHESTER AVE over NYCTA PELHAM LINE BRONX
Built 1937
RAMP SS ESS ESN SN over NYCDEP WATER MAIN
Built 2022
RAMP ES over CSX RR / AMTRAK RR RAMP
Built 2022
RAMP SE TO EDGEWAT over CSX / AMTRAK RR
Built 2022
Bruckner Expresswa over SHARED USE PATH
Built 2022
RTE I278 over BRONX RIVER
Built 1952
RAMP ES OVER I278 over GARRISON AVE PED PATH 2
Built 2022
RTE I278 over BRONX RIVER
Built 1952
Bridge Details
- Structure #
- 000000001066717
- Year Built
- 1964
- Length
- 39.9 m (130.9 ft)
- Max Span
- 18.8 m
- Width
- 32 m (105 ft)
- Lanes
- 4
- Daily Traffic
- 18,113
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,990,000
- Total Project Cost
- $19,011,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.