RAMP ES OVER I278 over GARRISON AVE PED PATH 2
N Edgewater Rd and Bruckn · County 005, New York · Built 2022 · 2 Lanes
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
40.822692, -73.885164
This bridge is in worse condition than 1.3% of bridges in County 005. The average bridge in New York is 0 years old; this one is 4 years old.
Nearby Bridges
Bruckner Expresswa over SHARED USE PATH
Built 2022
RTE I278 over BRONX RIVER
Built 1952
RTE I278 over BRONX RIVER
Built 1952
RTE I278 over BRONX RIVER AVE
Built 1968
RTE I278 over AMTRAK/CSXT/P&W
Built 1960
RTE I278 over AMTRAK/CSXT/P&W
Built 2013
RTE I278 over CSX TRANS/HNTS PT
Built 1950
RAMP SE TO EDGEWAT over CSX / AMTRAK RR
Built 2022
RAMP ES over CSX RR / AMTRAK RR RAMP
Built 2022
RAMP SS ESS ESN SN over NYCDEP WATER MAIN
Built 2022
Bridge Details
- Structure #
- 000000001080510
- Year Built
- 2022
- Length
- 224.3 m (735.9 ft)
- Max Span
- 38.1 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,448,000
- Total Project Cost
- $22,909,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.