RAMP I-278 WB Exit over E. 156TH STREET Shared

I-278 WB Exit 48 Off Ramp · County 005, New York · Built 2022 · 2 Lanes

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000106666J
Year Built
2022
Length
198.4 m (650.9 ft)
Max Span
48.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,636,000
Total Project Cost
$16,864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.